New Home Problem After Handover: What to Do, Who to Tell

Short answer: If a problem appears in your new home after handover, first limit the damage, then document it with photos and dates and report it in writing to the right party. A defect in the flat itself caused by construction or installation goes to the developer's after-sales team if it falls within the period in your contract. The pool, lifts and common areas go to the development's management, an appliance fault goes to the manufacturer or authorised service centre, and a leak coming from a neighbour is reported to that flat. If there is no reply or the claim is refused, get an independent technical report and consult a TRNC lawyer.

This article is for owners who have just collected the keys to a new home in Northern Cyprus and have met, or want to be prepared for, a leak, crack, fault or missing item in the first months. We take you through the process in order, from the moment you notice the problem until it is resolved: the first hours, identifying who to contact, working out whether the period has expired, reporting the problem, what to do if you get no reply, and following it up from abroad.

What should you do first when a problem appears after handover?

The first job is to stop the damage from growing. For a water leak, close the relevant valve or the main valve. For an electrical fault, switch off the relevant fuse. Preventing further damage is also your duty as the owner, and a leak that continues for days complicates any discussion about responsibility.

Then, before touching anything, document it:

  • General and close-up photos of the problem, and a short video if there is a leak, a noise or vibration.
  • The date and time you first noticed it, and when it happens: after rain, while the air conditioning is running, at a particular time of day?
  • The relevant documents you hold: the handover record (is the same issue noted there?), the defects and maintenance clause of the contract, and the appliance invoice or manufacturer's documents.

Do not have a non-urgent problem repaired straight away by yourself or by a tradesperson you know. A repair made without the developer's knowledge makes it harder to establish the source of the defect later and may weaken your claim.

How do you tell who is responsible for the problem?

Two questions are enough to identify who to contact: is the problem inside the flat or in a common area, and is the cause a construction fault, or misuse or a lack of maintenance?

  • Construction or installation defect inside the flat: a leak in a concealed pipe, a window that lets in water, a shower floor with the wrong slope. If it is within the period in your contract, it goes to the developer's after-sales team.
  • Common areas: the pool, lifts, gardens, shared roof and stairs. The first report goes to the development's management; if the problem was caused by construction, the management takes it up with the developer.
  • Appliances: air conditioning, built-in appliances, water heater. An appliance fault is covered by the manufacturer or authorised service centre; if the fault is an installation error, the developer may be responsible.
  • Neighbouring flat: if the source is inside the flat above, the repair is for that flat's owner.
  • Use and maintenance: a blocked trap, a dirty air-conditioning filter or a worn seal is the owner's own responsibility.

With leaks, the place where water appears can differ from its source. If you are not sure, send the same description in writing to both the after-sales team and the development's management. We have set out the division of responsibility, with its legal framework, in a table in our article on after-sales support and the development's management.

Is the defect still within the responsibility period?

We could not identify any regulation in the TRNC that binds all developers and sets out periods item by item for new homes. In practice, therefore, your sales contract determines the period and scope. Liability for defects under general law is a separate matter, and you should ask a TRNC lawyer about its scope.

Open your contract and check these four things:

  1. Scope: which items is responsibility defined for (structure, roof and waterproofing, plumbing and electrics, windows and doors, appliances)? Is there a period for each item, or a single general period?
  2. Start date: does the period start from key handover, from the completion certificate or from the transfer of the title deed? These dates can be months apart.
  3. Reporting channel: which email, form or address does the contract name?
  4. Appliances: does the builder take its own responsibility, or does the contract refer you to the manufacturer's or authorised service centre's documents?

An item written in the handover record is an obligation accepted at handover, whether or not it falls inside the period; report it using its number in the record. For surface defects that were not written in the record but were visible on handover day, making a claim becomes harder. We covered what to check on handover day in our handover checklist, and how to get these points written into the contract in our contract guide.

How do you report the problem, and how quickly should you expect a reply?

A report made by phone may not be logged. Report the problem in writing through the channel set out in the contract or the management plan, and include: the project name, block and flat number, the location of the problem, the date it was first noticed, photos and video, and the number in the handover record if there is one. If you spoke by phone, summarise the conversation in a short email the same day. Ask for a reference number or written confirmation that your request has been logged.

Response times vary with how urgent the problem is. If your contract does not state a time, the breakdown below can help you make clear what you are asking for in your correspondence:

UrgencyExampleYour stepWhat to expect
UrgentWater leak, electrical leakage (risk of shock), a railing that poses a safety riskTurn off the valve or switch off the circuit breaker, inform them by phone and report in writing the same dayFirst response or a temporary measure the same day
Short termAir conditioning not working, a window that will not close, a blocked drainWritten report with photos, reference numberA date given for an on-site inspection
PlannedPaint defect, hairline plaster crack, adjustment problemOne list together with the other itemsA written schedule for a combined repair

When a repair is finished, ask in writing for confirmation that the work is complete and, if needed, the date of the next check. It is also a good habit, a few weeks before the period ends, to walk through the whole home and report every open issue in a single written list. In our after-sales service we take requests with the project, block and flat details, and where owners are unsure whether something is covered, we work out the right contact together.

Which problems are common in the first year?

Most defects in a new home appear in the first winter and the first summer. Treating the first twelve months as a trial period helps you understand where a problem you meet might come from:

  • The first heavy rains: weaknesses in terrace and roof waterproofing, water coming in around window edges, damp from cracks in the external facade.
  • Winter damp: mould in closed, unheated flats, especially on the north-facing side and on bathroom ceilings. Some of it is a waterproofing or insulation defect and some is a lack of ventilation; a technical person should tell the two apart. We explain how to tell the cause in our damp and mould guide.
  • Summer heat: hairline cracks in paint and plaster on sun-facing facades, joints opening up, windows and doors going out of adjustment.
  • Homes close to the coast: corrosion that advances faster on air-conditioning outdoor units and metal railings. More detail is in our seaside home guide.
  • Water and electricity: pressure fluctuations, tank and pump settings, a fuse that trips often.

If you live in a development that has been handed over, such as Salamis Gardens, which we completed in the Salamis area of Famagusta, walking through the home after the first winter and first summer and reporting what you find in a single written list gets faster results than scattered phone calls. A request that arrives with photos and video also shortens the assessment.

Salamis Gardens, Salamis area (photo). In a completed development, the issues reported in the first year mostly fall under rain, damp and adjustment.

What if your request goes unanswered or is refused?

If the reply is late, first send a reminder through the same channel, quoting the date and reference number of your earlier report. If the request is refused, ask for the reasons in writing; a reason such as "misuse" or "the period has expired" determines the next step.

  1. Independent technical opinion: have a civil engineer or specialist tradesperson with no business link to the developer assess the source of the defect, and get their opinion in writing.
  2. Send the report: if the defect comes from construction or installation, give the report to the developer in writing and ask for a reasonable period.
  3. Legal opinion: if no agreement is reached, consult a TRNC lawyer with your contract, handover record, correspondence and technical report. Your lawyer can send a formal notice, and will assess whether court proceedings suit your case. We explain how to choose one in our property lawyer guide; official announcements about the courts are published on the TRNC courts website.

During this process, consult your lawyer before having another tradesperson carry out work to remedy the defect; in urgent cases, document any temporary measures you take with photos and invoices.

How do you follow up a problem if you are abroad?

When a problem arises while the owner is not on the island, the real question is who will enter the home, and with what authority. Settle this before any problem occurs: who holds the spare key, a local contact who knows where the valves and the fuse board are, and a written notice showing that you permit access to the home for repairs. You make the report, the contact opens the door, and they photograph the work before and after the repair.

In homes left empty for long periods, a small leak can go unnoticed for weeks, so someone should visit the home at regular intervals. We explain how to set this up while living in Turkey in our article on managing your Cyprus home from Turkey, and the first jobs after getting the key in our guide on what to do after buying a home.

Frequently asked questions

Is there a legal warranty period for new homes in Northern Cyprus?

We could not identify any regulation that binds all developers and sets out periods item by item for new homes. In practice, your sales contract determines the period and scope. Liability for defects under general law is a separate matter, and a TRNC lawyer should assess its scope.

Who should I report a fault in a common area to?

Make the first report to the development's management; operating and maintaining the common areas is its responsibility. If the fault is construction-related and the contract period is still running, the management passes it on to the developer. If you are not sure, send the same description in writing to both parties.

Who do I contact for an air-conditioning or built-in appliance fault?

A fault in the appliance itself is mostly covered by the manufacturer or authorised service centre, which is why the invoice or manufacturer's document given to you at handover, and the serial number, are useful. If the fault comes from installation, for example if the condensate drain was connected incorrectly, report it to the developer.

What happens if I have the fault repaired myself?

Except in an emergency, a repair made without the developer's knowledge makes it harder to establish the source of the defect later and may weaken your claim. In an emergency, take a temporary measure, document it with photos and an invoice, and report it in writing the same day.

I reported the problem but there is no reply. What should I do?

Send a written reminder through the same channel, quoting the date and reference number of your earlier report. If there is still no reply, get an independent technical opinion and consult a TRNC lawyer with your contract, handover record and correspondence. Keep all correspondence in a single file in date order.

To submit a request about one of Akol's projects, or to work out the right contact together, get in touch with us.

This article is for general information only and is not legal or technical advice. Last updated: November 2026.